Queenbeyan River


Thursday: 19th September 2013..

First Major Rapid.
Mic on second stage of the first big rapid.
Greg on second stage of the first big rapid.
Trees were a potential danger in a number of places. Both tea-tree and willows.
The river gauge showed 1.22m. note the second big rapid was after this.
Greg
Mic
Jiri
The other big rapid was also a 2 stage drop with a short pool between. Here is Greg.
A shot of the whole of the other big rapid which was also a 2 stage drop with a short pool between.
Jiri
Mic
Paddling up Burra Creek to the amazing London Bridge, the take out point
London Bridge: The finish
The only shot of me… well my boat anyway.
The river gauge report. Note it was about 1.5m the evening before and 1.35m in the early morning. When we got to the gauge it was 1.22 which was a good level, You wouldn't have wanted less water to make everything paddlable.